FAQs

Frequently Asked Question Based From Our Clients​

Our equipment adopts a flexible design, allowing model changeover through software parameter adjustment without replacing fixtures. The complete changeover process can usually be finished within 30 minutes, significantly reducing production downtime.

We provide remote diagnostics, on-site commissioning, operator training, and spare parts support. The equipment supports 4G, Ethernet, and VPN connections, and regular spare parts can usually be shipped within 48 hours.

Prismatic PACK lines can achieve 12–15 PPM, while cylindrical PACK lines can reach 30–40 PPM. Customized line balancing solutions are available based on your battery specifications and production targets.

Yes. All equipment supports MES integration and full-process traceability, covering data from cell loading and welding to final testing for intelligent factory management.

We offer flexible solutions from standalone machines to complete production lines, with semi-automatic or fully automatic options and phased expansion plans to reduce initial investment costs.

If you have a question Lets Submit Your Question